Acceptance plan after receiving diesel generator.

Acceptance plan after receiving diesel generator.

When we receive a diesel generator, we should do the following inspections:
1) When the unit is not started, check the appearance of the unit, whether all the instruments and cables, and the cable connectors are intact. If any problems are found, you need to do the corresponding treatments before acceptance.

2) After all the inspections before starting (including the water tank, fuel oil, water circuit oil pipeline and whether there are leaks in the pipeline joints, etc.), please manually start the diesel generator, check whether the parameters of the unit are normal, and then stop; Start the diesel generator with the key and check again whether the parameters of the unit are normal.
3) Connect the load to start, after the no-load start test is completed, perform manual and electrical start tests on the unit with load. Please note that during operation, you need to read the supporting operating instructions provided by the diesel generator, and carefully check whether the output parameters of the generator set are normal and whether the sound is abnormal.
4) Connect the load to start, let the diesel generator start with a part of the power supply, and carefully check whether the load is operating normally.
5) Check whether the protection performance of the generator set is intact, safe and reliable.